Klondike recently completed a major 36,000-square-foot addition to its existing cheese plant to enable the tripling of production output. A vast portion of the project required PDC Electrical Contractors’ electrical design and installation expertise. A major challenge was incorporating each specific equipment manufacturer and the complex engineering for each one. PDC installed a 2,000 amp switch-board extension, constructed three electric rooms housing 160 open-faced variable frequency drive assemblies and connected power to 155 motors on new processes totalling 855 hp. The project included 225,000 feet of wire and 12,000 feet of stainless raceway.

Description

Description

Gold Award

Specialty Contractor, Electrical: Industrial,
Over $1 Million

Klondike Muenster Cheese Process Addition
Monroe, WI

PDC Electrical Contractors

Owner: Klondike Cheese Co.
Designer: Power Engineers

Klondike recently completed a major 36,000-square-foot addition to its existing cheese plant to enable the tripling of production output. A vast portion of the project required PDC Electrical Contractors’ electrical design and installation expertise. A major challenge was incorporating each specific equipment manufacturer and the complex engineering for each one. PDC installed a 2,000 amp switch-board extension, constructed three electric rooms housing 160 open-faced variable frequency drive assemblies and connected power to 155 motors on new processes totaling 855 hp. The project included 225,000 feet of wire and 12,000 feet of stainless raceway.