Saint Michael’s Hospital – Emergency Department & In-Patient/Out-Patient Surgery

SKU: 1d0f578bcd1e Category:

This four-year, multi-phase, 30,000-square-foot project included an addition, ambulance garage and full renovation of the emergency and outpatient surgery departments, while allowing for patient access. Dust, noise and infection control was the highest priority for employee and partient comfort. Ellis Construction was met with many challenges, including limited space for construction and varying ages of the buildings from the 1920s, 1960s and 1980s. Several elements of the Emergency Department were moved to temporary locations during the project to maintain operations.

Description

Description

Silver Award

General Contractor, Healthcare,
Over $5 Million

Saint Michael’s Hospital – Emergency Department & In-Patient/Out-Patient Surgery
Stevens Point, WI

Ellis Construction

Owner: Saint Michael’s Hospital of Stevens Point, Inc.
Designer: Flad Architects

This four-year, multi-phase, 30,000-square-foot project included an addition, ambulance garage and full renovation of the emergency and outpatient surgery departments, while allowing for patient access. Dust, noise and infection control was the highest priority for employee and patient comfort. Ellis Construction was met with many challenges, including limited space for construction and varying ages of the buildings from the 1920s, 1960s and 1980s. Several elements of the Emergency Department were moved to temporary locations during the project to maintain operations.